Skip to Content

System restoration procedure and practices

https://cigre-preprod.apik.cloud/web/image/product.template/6804/image_1920?unique=6dc11c8

This Technical Brochure presents findings of the C2.23 WG on the general procedure and practices adopted by 18 transmission system operators (TSOs) over 5 continents, namely: Europe, Asia, Australia, North America and South America.

It also presents the major challenges encountered and the key lessons learnt during restoration of the disrupted power grid in recent major disturbances.

From these findings, a set of recommendations for follow-up work is made.

20.00 € 20.0 EUR 20.00 €

Not Available For Sale

This combination does not exist.

Terms and Conditions
30-day money-back guarantee
Shipping: 2-3 Business Days

PREPROD