Skip to Content

Primary / Secondary system interface modelling for total asset performance optimization

https://cigre-preprod.apik.cloud/web/image/product.template/3353/image_1920?unique=6dc11c8

Secondary installations in HV substations are constantly involved in renewal processes and the life cycle difference between the primary and secondary devices complicates those activities. A revision of the current renewal strategy is needed which will even have an impact on the design of new substations and systems. A standardised interface between the primary and the secondary systems will help to cope with these difficulties over the whole lifetime of the asset.

20.00 € 20.0 EUR 20.00 €

Not Available For Sale

This combination does not exist.

Terms and Conditions
30-day money-back guarantee
Shipping: 2-3 Business Days

PREPROD