Skip to Content

Guidelines to Cost Reduction of Air Insulated Substations

https://cigre-preprod.apik.cloud/web/image/product.template/4287/image_1920?unique=6dc11c8

This brochure provides a range of important information, which contributes to optimizing the construction cost of AIS substations from the conceptual engineering stage to project close out. A number of case studies are also included in the brochure to show how cost reductions have been achieved in practice by various utilities.

270.00 € 270.0 EUR 270.00 €

Not Available For Sale

This combination does not exist.

Terms and Conditions
30-day money-back guarantee
Shipping: 2-3 Business Days

PREPROD