Skip to Content

Green field network, designing future networks ignoring existing constraint

https://cigre-preprod.apik.cloud/web/image/product.template/2080/image_1920?unique=6dc11c8

This WG examined power system architecture design without any constraints except four such as generation distribution, demand distribution, land condition, and acceptable reliability. For a fictitious region for the green field network designing ten designs were received. The finding is that the knowledge planners use is classified into two types; tacit knowledge and explicit ones. They need to understand that they utilize both types of knowledge to design uncertain network.

140.00 € 140.0 EUR 140.00 €

Not Available For Sale

This combination does not exist.

Terms and Conditions
30-day money-back guarantee
Shipping: 2-3 Business Days

PREPROD